POWER / CEBU
Will I have a power interruption in my area?
Visayan Electric’s published interruption schedule, refreshed automatically. Every time is Cebu time.
Tell me where you are
Type your barangay, street or city for a local answer.
Rotational windows are used only if NGCP, the national grid operator, asks Visayan Electric to reduce load.
Checking the published schedule in Cebu time.
Supplemental FYI plan map
FYI is a separate supplemental service. Its plans and operator records are not confirmation for this address; use the published Visayan Electric schedule above for the local answer.
Readable Cebu plan windows for today and tomorrow
The plan-window list is available. The supplemental map loads as this panel approaches the viewport.
Open AboitizPower FYI for the separate source.
- Outside the selected plan window, subdued dots
- Confirmed individual feeder records
- Selected current plan window
- Selected future plan window
- Selected finished plan window, subdued dots
- Aggregate operator activity is not assigned to individual dots.
- Your browser location, when shared
Published schedule
Today’s published window is ready below. Open the schedule to filter every record by city, type, day, or finished history.
Browse schedule Loading the published schedule…
Possible rotational brownouts are mapped windows, not confirmed outages. Visayan Electric carries them out only if NGCP calls for load reduction that day.